Integrated contracting

MEP · coordination · delivery

Connected systems.
Clearer performance

We coordinate building systems from engineering assessment through installation, testing and handover—with clear roles at every interface.

Water treatment equipment with membrane vessels, piping and pumps
Systems in sequenceFIG. 01 · MEP

01Systems within the scope

From infrastructure to intelligent control

Connected disciplines coordinated around project needs, site conditions and the agreed scope.

01

Water treatment

Wastewater treatment, greywater and reuse, membrane systems and disinfection.

02

Fire protection

Fire pumps, sprinklers, hydrants and hose systems, and extinguishers.

03

Plumbing & pumping

Water supply, drainage and irrigation networks, with booster sets.

04

Electrical, security & smart systems

Cables and panels, surveillance, communications and smart-home systems.

05

Instrumentation & control

Automation, measurement and industrial equipment.

06

Industrial supply

Valves, pipes, fittings and engineering materials.

02A clear coordination model

Connected responsibilities. Distinct roles

MIZAN

Delivery coordination

Mizan coordinates the client, site preparation, civil works, installation and handover.

ATLAS ITS · TÜRKİYE

Equipment & manufacturer coordination

ATLAS ITS is the equipment-supply, manufacturer-coordination and technical-support partner for MEP systems.

The scope and responsibilities for each stage are agreed with the client to suit the project.

03A sequence for delivery

Five stages. Interfaces in view

The scope and responsibility of each stage remain subject to the project and client agreement.

  1. 01

    Assessment & engineering

    Understand requirements, site conditions and system interfaces; define the engineering approach.

  2. 02

    Procurement & logistics

    Coordinate delivery planning with ATLAS ITS, which handles equipment supply and manufacturer coordination.

  3. 03

    Civil works & installation

    Prepare and coordinate site interfaces, civil works and system installation.

  4. 04

    Testing & commissioning

    Coordinate checks and commissioning activities for installed systems.

  5. 05

    Training & maintenance support

    Coordinate equipment training and technical support with ATLAS ITS within the agreed project scope.

Systems shape the place

Let’s coordinate what your project needs next

Architecture & interior design
Discuss your project